AMHS
Automated Material Handling System

Integrated and optimized solutions and services for materials handling system, from consulting to transport control and optimal operations.

Optimize factory and warehouse operations with
Samsung SDS materials handling automation solutions.

We offer end-to-end one-stop service from line planning, equipment installation, system integration to materials handling operation with our integrated and optimized
Samsung SDS AMHS solution.

Introduction

  • Samsung SDS AMHS offers real-time monitoring and optimal AGV task assignment.

00

00

Key Benefits


We offer end-to-end integrated and optimized solution and services for AMHS, from professional consulting to equipment installation & system integration and materials handling operations.

Consulting>Equipment-based Control>Factory-wide Integrated Control/Mgmt.>Operation info table
Consulting Equipment-based Control Factory-wide Integrated Control/Mgmt. Operation
Optimal Layout & Material Flow Design
  • SCS, Stocker Control
  • ACS, AGV Control
  • ECS, Loader Control
  • HCM, MOS Standard I/F
Equipment Control : Shuttle/Crane/Robot Control, Motion Control, Route/Job Management
Interface : (TCP/IP, Field Bus, PLC, Serial, Sensor etc)
  • STK
  • AGV
  • Loader
  • Equipment
  • MCS, Material Control
  • SEMS, Integrated Control & Mgmt.
Integrated Control : Transport/Congestion Control & Integrated Monitoring
Operation & Maintenance
* STK(Stocker) : A type of equipment used to store and manage the flow of materials, AGV: Automated Guided Vehicle SCS(STK Control System), ACS(AGV Control System) ECS(EQ Control System), HCM(Host Communication Module) * MCS(Material Control System) SEMS(Smart EQ Management System)

FAQ


Find answers to frequently asked questions.

  • We provide a one-year warranty, during which on-call support is available. You may also opt to enter into an operations service contract. When an AMHS system upgrade is requested, we first conduct a preliminary assessment before making necessary recommendations.

  • The implementation requires six steps: requirements gathering, site assessment, action item development, implementation, integration & testing, and stabilization. Typically, the estimated period is six months but may vary depending on the scale, industry, location, etc.

  • Our solution supports standard interfaces for integration with third party controller and hardware. We have multiple references of such implementation where compatibility was provided.

Let’s talk

Whether you’re looking for a specific business solution or just need some questions answered, we’re here to help

Share